Road Projects
 
  Name Description Estimated Cost $ Approx Bid Date
1

Seal Coat & Road Repair

89 miles  1,000,000 July 15
2 Safety Improvements Intersection, Kaster and Guthrie 250,000.00 July 15
3 Motor Paving 66 miles 346,488 Aug 15
    Sub Total Roads 1,596,488.36  

 Bridge/Culvert Projects
 

  Name Description Estimated Cost $ Approx Bid Date
1 Illinois Avenue RR Grade Separation
8,716,310
May 3
2 Teeter Road  52' Box Beam 342,175 Sep. 13
 
3 Millsboro West Road  63' Box Beam
 
297,800
 
Sep. 13
 
4 Marion Avenue Road  18' Concrete Box
 
213,595
 
Sep. 13
 
5 Werner Road  19' Alum Box
 
189,056
 
Sep. 13
 
6 Darlington N. Road  20' Alum Box
 
280,855
 
Sep. 13
 
7 Stein Road  55' Box Beam
 
318,192
 
Sep. 13
 
8  Ankneytown Road  35' 3-sided Box
 
399,629
 
Sep. 13
 
9 Stiving Road  63" x 98" Conduit
 
82,000
 
July 30
 
10 Hale Road  28' 3-sided Box
 
167,000
 
May 1
 
11 Lucas-Perrysville 68" x 106" Aluminum Conduit
 
152,000
 
April 10
 
12  Leiter Road 77" x 121" Conduit
 
94,000
 
June 30
 
13 Shelby-Ganges Road  20' x 5" Concrete Box
115,000
Sep. 15
    Sub Total Bridges 11,367,612.00  

 Materials
 

  Name Description Estimated Cost $ Approx Bid Date
1 Asphalt (8,400 ton)   252,000 April 15
2 Stone (17,000 ton)   135,000 April 15
    Sub Total Materials 387,000  
    Total 2006 13,351,100.36  
 
 
 *  Contingent on Ohio Public Works Commission funding