**PUBLIC NOTICE**

Date: 3/25/2024

 Richland County plans to replace bridge on Townline Road in Butler Township, Richland County, Ohio

 The Richland County Engineer’s Office (RCEO), in coordination with Ohio Department of Transportation (ODOT) District 3, is currently preparing plans for bridge replacement work along Townline Road (TR 79), approximately 250 feet north of the Townline Road and Noble Road intersection in Butler Township. See “2024 Planning Map” link below for the location or Google Maps Location.

The project proposes to improve Townline Road by replacing the existing bridge over Clear Creek with a single-span prestressed non-composite concrete box beam bridge. Construction is anticipated to begin in the spring/summer of 2025 and is expected to last approximately three (3) months. The bridge will be closed to traffic during construction.

The project will require a 90-day detour of vehicular traffic.  The Townline Road northbound detour will be: west on Noble Road to north on Strimple Road, to east on Baseline Road. The Townline Road southbound detour will be the reverse of the northbound detour.  Local traffic will be maintained to all abutting properties.

Written comments about the proposed project may be mailed to Adam Gove, P.E., P.S., Richland County Engineer, 77 N. Mulberry St., Mansfield, OH 44902.  You can also contact the Richland County Engineer by telephone at 419-774-5591, or by email at info@rcengineer.com.  Comments need to be received by April 30, 2024.

2024 Projects

Crider Rd Bridge CR92-4.57 (Contract) (Closed – Mosser Const.)
Linn Rd Bridge CR232-1.77 (Contract) (Closed – Adena Corp.)
Rhinehart Rd Bridge CR398-3.05 (Contract) (Closed – R&I Const.)
Faulk Rd Bridge TR12-0.58 (Force Account) (Closed)
Forbes Rd Bridge TR374-1.52 (Force Account) (Estimated Start Late Summer)
Pennel Rd Bridge TR75-0.77 (Force Account) (Estimated Start Early Summer)
Brubaker Creek Rd Bridge TR138-1.19  (Contract) (Closed – Crawford Const.)
London West Rd Bridge CR58-3.61 (Contract) (Awarded VO Menuez & Son- Est. Start Summer 2024)

Chip Seal Roads – Baseline Rd, Clear Creek Rd, Olivesburg Fitchville Rd, Hummel Rd, Ernsberger Rd, Mt. Zion Rd, Shelby Ganges Rd,  Five Points East Rd, Bellville Johnsville Rd, Marion Ave Rd, London East Rd

Paving Roads – Hot Mix (Cairns Rd, Marion Ave Rd, Cook Rd); Cold Mix (Brennemen Rd, Noble Rd, Opdyke Rd, Wheatcraft Rd);

 

_______________________________________________________________________________________________________________________

Planned 2025-2028 Projects

Baseline Rd Bridge CR11-9.97
Hunter Rd Bridge TR366-0.69
Armstrong Rd Bridge TR113-0.67
Mock Rd Culvert (Perry Township) (2024?)
Rome Greenwich Rd Bridge CR76-9.01
McNaul Rd Bridge TR249-1.29
Coursen Rd Bridge TR128-0.82 (Plans Underway)
Champion Rd Bridge CR182-1.76 (Design-Build) (Awarded Crawford Const.)
Townline Rd Bridge TR79-4.19 (Plans Underway)
Lex Springmill at Home Road Roundabout (Plans Underway)
Lex Springmill Shoulder Widening (Marion to Home) (Plans Underway)
Marion Ave Rd Bridge CR146-0.04 (Plans Underway)
Shoup Rd Bridge TR185-1.11