419-774-5591
77 N Mulberry Street, Mansfield, Ohio
road closures

Road Closures

SHORT TERM CLOSURES (Not Mapped Below)

Lucas-Perrysville Road, between St Rt 39 and Dickes Road in the Village of Lucas/Monroe Township, will be CLOSED starting Monday, October 5, and will remain closed thru Thursday, October 8.  The closure will allow for a culvert replacement.
 
 

EXTENDED CLOSURES (Mapped Below)

Poth Road, between Everett Lane and North Trimble Road in Madison Township, is now CLOSED, and will remain closed until further notice.  The closure is due to the condition of a bridge.  The timeframe for repair or replacement of the bridge is unknown at this time.

Lexington-Springmill Road, between Cook Rd and Marion Avenue Rd, and Home Road, between Lexington-Springmill Rd and Marion Avenue Rd, will be CLOSED starting Monday, June 15, and will remain closed for one hundred and twenty (120) days.  The signed detour will utilize Lexington Avenue (US-42), Trimble Rd, and Park Avenue West (St Rt 430). The Richland B&O Bike Trail will remain OPEN at its crossing with Lexington-Springmill Road at Home Road until Tuesday, July 7.  The Bike Trail will CLOSE on the morning of Tuesday, July 7 and will remain closed for ninety (90) days.  The Bike Trail closure was originally scheduled for June 30. These closures will allow for the installation of two bridges and a roundabout at the Lexington-Springmill Rd/Home Rd intersection.

**Construction Update – Lexington-Springmill Roundabout**

The tentative OPENING DATES are as follows:

Richland B&O Trail – Friday, October 23

Lexington-Springmill Rd/Home Rd Intersection – Friday, October 30

These are approximate dates and are weather dependent.  A separate notice will be sent out when the Bike Trail and roadway are officially open.

 

Open map in a new tab